OP is talking about the failure mode when you pull the cable out of the plug - the live and neutral cables are shorter and tighter and will fail first, leaving the earth wire to fail last.
I didn't quite understand the whole concept. The idea in Schuko plugs is that you cannot pull the cable out of the plug. It's totally fixed (either inside solid plastic, or attached with a strain relief that fixes it).
edit: now that I think of it, Schuko plugs of the install-yourself kind where you can attach cable with a screwdriver (not solid plastic with the cable) are done so that the earth cable is longer than L/N are inside the casing.
Most combination Schuko/French plugs I've seen recently are even designed in such way that when all wires are same length then the PE one has larger slack inside the plug.
OP is talking about the failure mode when you pull the cable out of the plug - the live and neutral cables are shorter and tighter and will fail first, leaving the earth wire to fail last.