Hacker News new | past | comments | ask | show | jobs | submit login

> There's no plan to hook ITER up to a thermal plant because it's a research reactor not a power plant

Interestingly, that's not really true: IIRC the japanese team working on the WCCB breeder module (that uses supercritical water as coolant) plans on connecting the water loop to a small turbine. If they succeed it would be the first ever electrical power produced from fusion.




Ability of steam to drive a turbine doesn't seem to be in dispute.

Making tea would be better theater, if they need that, and cheaper: "the first tea ever brewed by over-unity fusing neutrons".




Consider applying for YC's Fall 2025 batch! Applications are open till Aug 4

Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: