Hacker Newsnew | past | comments | ask | show | jobs | submitlogin

A failure would mean all the water bursts out and the ship is stuck again. I don’t see how that would set us back much?


The spot where the ship is abuts to a town with a 750k pop. There are residential neighborhoods directly adjacent to the canal.


Ah, yeah. Given the location I think the original plan is already a bit hard to execute, even without the flood risk.




Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: