Except, if I got the sequence right, it turned into "bait and switch:"
Priorities shifted. Management traded my project away to our sister team in India. In exchange, that team gave us one of their projects. It was an undocumented system, built on deprecated infrastructure, but it was nevertheless a critical component in production. I was assigned to untangle it from our sister team’s code and migrate it to a new framework, all while keeping it running in production and hitting its performance metrics.
Priorities shifted. Management traded my project away to our sister team in India. In exchange, that team gave us one of their projects. It was an undocumented system, built on deprecated infrastructure, but it was nevertheless a critical component in production. I was assigned to untangle it from our sister team’s code and migrate it to a new framework, all while keeping it running in production and hitting its performance metrics.