Yep these facilities require >100MW and require their own substations. Hence one reason why it takes so long to build.



I'd imagine that the lead time on getting the substation equipment is probably the longest for all of equipment inside a DC. Chillers, UPSs, generators, and breakers are probably not in as high demand or take as long to manufacture as a MV XFMR.


Why not shorten the lead time by biding higher for freshly built XFMRs from other countries of the desired capacity?